Here are some photos of construction on the storage depot and clinic from the past week:

Laying Rebar for the Depot Floor

Mixing Concrete

Pouring the Depot Floor

Blocks for Storage Depot

Setting the String for Blocks

Placing Blocks

Half-finished Depot

Pouring Footings for Clinic

Storage Depot – 10/31

Storage Depot – 11/1

Storage Depot – 11/2

Storage Depot – 11/3